Installed cost
$9,190 – $16,140
$7.50 – $13.50 / sq ft
Concrete (+10%)
24.44 yd³
Net 22.22 yd³ at 6 in
80-lb bags
1,100
1,467 × 60-lb
Best way to buy
Ready-mix
4 trucks, $3,795

A 30 × 40 ft slab (1,200 sq ft) is the most common pole barn, metal building and barndominium size. At 6 in it is 24.44 yd³ of concrete in 4 trucks, a pour that needs a full crew, a plan for truck access, and usually a pump or a buggy.

Concrete for a 30x40 Slab at 4, 5 and 6 Inches

ThicknessNet volumeWith 10% wasteReady-mix order80-lb bags60-lb bags40-lb bagsInstalled
4 in 14.81 yd³ 16.30 yd³ 16.5 yd³ 734 978 1,467 $7,970–$14,620
5 in 18.52 yd³ 20.37 yd³ 20.5 yd³ 917 1,223 1,834 $8,580–$15,380
6 in (typical) 22.22 yd³ 24.44 yd³ 24.5 yd³ 1,100 1,467 2,200 $9,190–$16,140
Bag yields: 80 lb = 0.60 ft³, 60 lb = 0.45 ft³, 40 lb = 0.30 ft³, rounded up to whole bags. Ready-mix rounded up to the next quarter yard. Installed low end: plain broom-finish slab with ready-mix at $150/yd³ plus a $120 delivery fee, forms and labor at $3.50/sq ft. High end: the calculator's default scope (adds a vapor barrier and #4 rebar at 18 in, labor at $5.00/sq ft) plus 25% contractor overhead and profit. DIY materials: the cheaper of ready-mix or $6.50 80-lb bags, plus forms, up to vapor barrier and rebar. Site excavation and a gravel base are extra (about $1.40 to $3.30 per sq ft).

How Much Extra to Order

The table above adds 10%, the usual allowance for a formed slab on a graded base. Pick less only for rigid forms on a laser-flat base, more for soft or uneven ground:

Waste allowance (6 in slab)Concrete80-lb bags
0% (exact volume)22.22 yd³1,000
5%23.33 yd³1,050
10%24.44 yd³1,100
15%25.56 yd³1,150

Bags or a Ready-Mix Truck?

OptionWhat you buyConcrete bill
80-lb bags 1,100 bags at $6.50 + mixer rental $75 $7,225
Ready-mix 24.5 yd³ at $150 + $120 delivery $3,795

Ready-mix, without question. 1,100 bags would cost $7,225 and take about 44 hours of mixing, far longer than concrete stays workable, so the slab would end up with cold joints. Ready-mix trucks bring it as fast as the crew can place it (4 trucks of about 8–10 yd³ each). Try your own prices in the bags vs. ready-mix calculator.

What a 30x40 Slab Costs

Line item (6 in slab)BasisCost
Ready-mix concrete + delivery24.44 yd³ at $150 + $120$3,787
Forms140 lin ft at $2.20$308
Vapor barrier1,200 sq ft at $0.35$420
#4 rebar at 18 in1,200 sq ft at $1.25$1,500
Broom finish1,200 sq ft at $0.75$900
Labor (place & finish)1,200 sq ft at $5.00$6,000
Direct costBefore overhead and profit$12,915
  • Installed price: $9,190 – $16,140. The low end is a plain slab with lower-cost labor; the high end is the full scope above plus 25% contractor overhead and profit.
  • Site prep and gravel base (excavation and 4 in of compacted stone): about $1,680 – $3,960 more.
  • Thickened edge (12 in wide, 12–18 in deep) if the building sits on the slab: 2.8–5.5 yd³ more concrete, about $420 – $830, plus trenching and two #4 bars around the edge.
  • Permit, where one is needed: about $50 – $350.

Have a contractor's price? Put it into the concrete quote checker, or compare two or three bids side by side there.

Materials List for a 30 × 40 ft Slab

Concrete24.5 yd³ ready-mix, or 1,100 × 80-lb / 2,200 × 40-lb bags
Gravel base (4 in compacted)17.04 yd³, about 23.9 tons
Forms14 × 2x6 boards 12 ft long, 58 stakes, 116 screws (140 lin ft)
Rebar (#4 at 18 in)1,745 lin ft = 88 × 20-ft sticks, 154 chairs
Rebar (#4 at 12 in, heavy loads)2,602 lin ft = 131 × 20-ft sticks, 88 chairs
Or wire mesh (6x6)35 sheets of 5 × 10 ft, about $420 – $700
Vapor barrier1,200 sq ft plus 6 in laps
Control joints 6 panels of about 13.3 × 15 ft: 100 lin ft of saw cut, 1.5 in deep

Recommended Specs for a Shop Or Barn Floor

Thickness6 in for shops with heavy vehicles, lifts or machinery; 4-5 in for light storage
Strength4,000 PSI for heavy trucks and de-icing salt; 3,500 PSI air-entrained minimum
Base4 to 6 in of compacted crushed stone, plus a vapor barrier if the building will be heated
Reinforcement#4 rebar at 12-18 in on chairs; heavier where an engineer specifies it
EdgeThickened edge or footings at the walls; post-frame buildings set their posts on separate footings
  • Metal and post-frame buildings set their columns on separate footings or piers; pour those first and form the slab around them.
  • For a barndominium or any heated space, add a vapor barrier and, where it freezes, perimeter insulation.
  • Ask about a laser screed or a second finishing crew: 1,200 sq ft is a lot of surface to finish before it sets.

Pour Day for a 30x40 Slab

  • Crew time: about 42 crew-hours to set forms, place, finish and cut joints (0.035 h per sq ft for a broom finish).
  • Trucks: 24.5 yd³ is 4 trucks, about 123–196 minutes of unloading in total. Concrete must be placed within 90 minutes of batching.
  • Reach: a truck chute reaches about 15–20 ft. At 30 ft wide, the middle is out of reach from one side, so plan access on two sides, a buggy, or a pump ($600 – $1,200).
  • Joints: saw-cut 4–12 hours after finishing with a wet saw, or 1–4 hours with an early-entry saw.
  • Curing: foot traffic after 24–48 hours, cars after 7 days, full strength at 28 days.

Price Your Own 30x40 Slab

The calculator below starts at 30 × 40 ft, 6 inches. Change the thickness, finish or reinforcement, pick your state for local prices, and the Live Estimate updates with a blueprint of the joint and rebar layout.

Concrete Slab Cost & Volume Estimator

Precision multi-layer project budgeting: Materials, Sub-Base, Reinforcement, Labor & Equipment

Picking a location sets the ready-mix, excavation and labor rates below to that area's typical level. You can still type your own local prices afterwards. Slab prices by state.

ft
ft
in
$
$ /sq ft
inches
$ /yd³
$ /lin ft
$ /sq ft

Closer spacing uses more steel and raises the rebar cost.

$
$ /sq ft
$

Not charged when bagged concrete is selected.

$
$
$
$ /sq ft
%
%
Live Estimate
Estimated Total Project Budget
$13,560.40
$11.30 / sq. ft.
$121.64 / m²
Based on U.S. national average rates
Order Volume (w/ Waste)
24.44 yd³
Net: 22.22 yd³
Or Bagged Equivalent
1100 bags
80-lb pre-mix bags
Total Surface Area
1,200 sq ft (111.5 m²)
Order volume: 18.69 m³
Estimated Wet Weight
95,700 lbs
Perimeter: 140 ft
Concrete
Labor
Prep/Base
Rebar
Forms

A scaled plan of your slab: rebar grid at the spacing you chose, support chairs about every 3 to 4 ft, and the recommended control-joint saw cuts (2.5 times the thickness in inches, in feet, capped at 15 ft). It redraws as you change the inputs.

30x40 Slab Questions

About $9,190 to $16,140 installed for a 6-inch slab with forms, a broom finish and labor ($7.50 to $13.50 per sq ft), at U.S. average prices. DIY materials run about $4,090 to $6,010. Site prep and a gravel base add about $1,680 to $3,960.

At 4 inches thick with 10% waste: 734 bags of 80-lb mix, 978 bags of 60-lb mix or 1,467 bags of 40-lb mix. At 6 inches: 1,100 bags of 80-lb mix.

At 4 inches, 14.81 cubic yards (order 16.50 with waste); at 5 inches, 18.52 (order 20.50); at 6 inches, 22.22 (order 24.50). Ready-mix is sold in quarter yards, so round up.

Ready-mix. 24.5 yards delivered costs about $3,795, while 1,100 bags would cost about $7,225 and take roughly 44 hours of mixing. Bags only win below about 1.3 cubic yards.

A #4 grid at 18 inches each way needs about 1,745 linear feet of bar including laps: 88 twenty-foot sticks and about 154 chairs. Welded wire mesh instead takes 35 sheets of 5 x 10 ft.

The installed range on this page is for a 6-inch slab with forms, vapor barrier, #4 rebar and a broom finish. Excavation, gravel, a thickened edge and a pump are extra; the page lists each.

Related Guides

Slab Estimating & Editorial Engineering Team

Construction Cost Estimators & Civil Engineering Analysts
Our team specializes in structural flatwork estimating, concrete mix designs, and civil building codes (ACI 302.1R, ASTM C94). All calculators and cost guides are rigorously validated against live contractor material price sheets, regional aggregate indexes, and real-world project bids.