From Volume to an Order

Yards to order
(L × W × T ÷ 12) ÷ 27 × (1 + waste %) → round up
Plants sell in 0.25 or 0.5 yd steps, so always round up, never down.

Running short is far more expensive than a little extra. A second delivery means another delivery fee and often a short-load fee ($80 to $200), and the first concrete may set before the rest arrives, leaving a weak cold joint. A truck carries about 8–10 yd³, so larger pours need more than one load, and many plants charge extra for orders under 5–6 yd³. The ready-mix calculator shows those fees and prices by strength.

Need a Full Project Cost Estimate?

This tool works out one part of the job. Our Concrete Slab Cost Calculator prices the whole slab: concrete, gravel base, forms, vapor barrier, reinforcement, finish, labor and delivery.

Open the Slab Cost Calculator →

Frequently Asked Questions

At 4 inches thick, 4.94 cubic yards. With 10% waste, order 5.50 yd³. At 5 inches order 7.00 yd³, and at 6 inches 8.25 yd³.
One cubic yard covers about 81 sq ft at 4 inches thick, 64.8 sq ft at 5 inches and 54 sq ft at 6 inches, before waste.
Always up. Plants sell in quarter or half-yard steps, and being short mid-pour costs a second delivery and can leave a cold joint.