Fence Post Concrete

Changing the post or fence height fills in a suggested hole: about 3 × the post width, and 1/3 of the height buried plus 6 in of gravel. Edit them for your soil or frost depth.

Bags for all posts
17 bags
$111 in mix
Bags per post
1.7
1.01 ft³ per hole (+10%)
Gravel under posts
2.7 ft³
6 in in each hole

How Deep and Wide to Dig

Two rules of thumb set the hole. Depth: bury 1/3 to 1/2 of the post's above-ground height, then add 6 in for a gravel base that lets water drain away from the end grain. In cold climates the bottom must also be below the frost line, often 36–48 in in northern states, or frost will heave the post. Width: about 3 times the post's width, so a 4x4 (3.5 in actual) gets a 10 in hole and a 6x6 (5.5 in) a 16 in hole.

Fence and postHole80-lb bags / post50-lb fast-set / postRegular mix cost / post
4 ft fence, 4x424 in deep × 10 in wide1.32.0$8.23
5 ft fence, 4x424 in deep × 10 in wide1.32.0$8.23
6 ft fence, 4x430 in deep × 10 in wide1.72.7$10.97
6 ft fence, 6x630 in deep × 16 in wide4.37.0$28.27
8 ft fence, 4x436 in deep × 10 in wide2.13.4$13.71
8 ft fence, 6x636 in deep × 16 in wide5.48.7$35.34
Holes dug to bury 1/3 of the above-ground height plus 6 in of gravel; 10% waste included. Fractions of a bag carry over to the next hole.

Regular Mix or Fast-Setting?

Both make a solid post. The difference is time and price:

  • Regular 80-lb mix costs about $10.83 per cubic foot ($6.50 a bag). Mix it in a wheelbarrow, fill the hole, then brace the post for a day or two before hanging boards.
  • Fast-setting 50-lb mix costs about $22.67 per cubic foot ($8.50 a bag), roughly twice as much. Pour it into the hole dry, add water, and it sets in 20–40 minutes; you can hang rails and boards after about 4 hours.

For a long fence, regular mix saves real money; for a gate post you need to hang today, or a few posts on a weekend, fast-setting is worth it. Either way, crown the top of the concrete so rain runs away from the post.

Chain Link Posts

Chain link uses steel pipe. Line posts are the thinner pipe; corner, end and gate posts are thicker and take the wire tension, so they get the bigger hole.

PostHole80-lb bags / post50-lb fast-set / post
Line post (2-3/8 in steel pipe (chain link line post))8 in × 30 in1.21.9
Corner / end / gate post (2-7/8 in steel pipe (chain link terminal post))10 in × 30 in1.82.9

Setting a Post Step by Step

  1. Dig the hole to depth with a post-hole digger or auger, a little wider at the bottom than the top.
  2. Put in 6 in of gravel and tamp it, so water drains away from the post's end.
  3. Set the post, check it for plumb on two faces, and brace it with two stakes.
  4. Fill with concrete to just below ground level and slope the top away from the post.
  5. Let regular mix cure a day or two before you hang heavy gates or boards.

Building a bigger footing or a deck pier? Use the footing and pier calculator. Pouring a slab? Start with the bags calculator.

Frequently Asked Questions

For a 4x4 post on a 6 ft fence in a 10 in wide, 30 in deep hole: about 1.7 bags of 80-lb mix or 2.7 bags of 50-lb fast-setting mix. Taller fences and 6x6 posts need more; see the table.

About 17 bags of 80-lb mix or 28 bags of 50-lb fast-setting mix for ten 4x4 posts on a 6 ft fence, with 10% waste.

Bury a third to a half of the post's above-ground height and add 6 in for gravel: about 30 in for a 6 ft fence. In cold climates go below the frost line.

Fast-setting post mix is made to go in dry with water poured on top. Regular concrete mix should be mixed with water first; dry-packed regular mix hardens unevenly and ends up weaker.

They are the same concrete; only the bag size differs. One 80-lb bag makes 0.60 ft³ and a 60-lb bag 0.45 ft³, so you need about a third more 60-lb bags. Pick the size you can lift and mix comfortably.