Installed cost
$5,250 – $9,350
$7.00 – $13.00 / sq ft
Concrete (+10%)
12.22 yd³
Net 11.11 yd³ at 5 in
80-lb bags
550
734 × 60-lb
Best way to buy
Ready-mix
2 trucks, $1,958

A 24 × 30 ft slab (720 sq ft) is a roomy two-car garage with space for a workbench, storage and a second fridge. Poured 5 in thick it needs 12.22 yd³ in 2 trucks, and a crew of three or four finishers working together before it sets.

Concrete for a 24x30 Slab at 4, 5 and 6 Inches

ThicknessNet volumeWith 10% wasteReady-mix order80-lb bags60-lb bags40-lb bagsInstalled
4 in 8.89 yd³ 9.78 yd³ 10 yd³ 440 587 880 $4,880–$8,900
5 in (typical) 11.11 yd³ 12.22 yd³ 12.25 yd³ 550 734 1,100 $5,250–$9,350
6 in 13.33 yd³ 14.67 yd³ 14.75 yd³ 660 880 1,320 $5,620–$9,810
Bag yields: 80 lb = 0.60 ft³, 60 lb = 0.45 ft³, 40 lb = 0.30 ft³, rounded up to whole bags. Ready-mix rounded up to the next quarter yard. Installed low end: plain broom-finish slab with ready-mix at $150/yd³ plus a $120 delivery fee, forms and labor at $3.50/sq ft. High end: the calculator's default scope (adds a vapor barrier and #4 rebar at 18 in, labor at $5.00/sq ft) plus 25% contractor overhead and profit. DIY materials: the cheaper of ready-mix or $6.50 80-lb bags, plus forms, up to vapor barrier and rebar. Site excavation and a gravel base are extra (about $1.40 to $3.30 per sq ft).

How Much Extra to Order

The table above adds 10%, the usual allowance for a formed slab on a graded base. Pick less only for rigid forms on a laser-flat base, more for soft or uneven ground:

Waste allowance (5 in slab)Concrete80-lb bags
0% (exact volume)11.11 yd³500
5%11.67 yd³525
10%12.22 yd³550
15%12.78 yd³575

Bags or a Ready-Mix Truck?

OptionWhat you buyConcrete bill
80-lb bags 550 bags at $6.50 + mixer rental $75 $3,650
Ready-mix 12.25 yd³ at $150 + $120 delivery $1,958

Ready-mix, without question. 550 bags would cost $3,650 and take about 22 hours of mixing, far longer than concrete stays workable, so the slab would end up with cold joints. Ready-mix trucks bring it as fast as the crew can place it (2 trucks of about 8–10 yd³ each). Try your own prices in the bags vs. ready-mix calculator.

What a 24x30 Slab Costs

Line item (5 in slab)BasisCost
Ready-mix concrete + delivery12.22 yd³ at $150 + $120$1,953
Forms108 lin ft at $2.20$238
Vapor barrier720 sq ft at $0.35$252
#4 rebar at 18 in720 sq ft at $1.25$900
Broom finish720 sq ft at $0.75$540
Labor (place & finish)720 sq ft at $5.00$3,600
Direct costBefore overhead and profit$7,483
  • Installed price: $5,250 – $9,350. The low end is a plain slab with lower-cost labor; the high end is the full scope above plus 25% contractor overhead and profit.
  • Site prep and gravel base (excavation and 4 in of compacted stone): about $1,010 – $2,380 more.
  • Thickened edge (12 in wide, 12–18 in deep) if the building sits on the slab: 2.5–4.6 yd³ more concrete, about $370 – $690, plus trenching and two #4 bars around the edge.
  • Permit, where one is needed: about $50 – $350.

Have a contractor's price? Put it into the concrete quote checker, or compare two or three bids side by side there.

Materials List for a 24 × 30 ft Slab

Concrete12.25 yd³ ready-mix, or 550 × 80-lb / 1,100 × 40-lb bags
Gravel base (4 in compacted)10.22 yd³, about 14.3 tons
Forms10 × 2x6 boards 12 ft long, 42 stakes, 84 screws (108 lin ft)
Rebar (#4 at 18 in)1,036 lin ft = 52 × 20-ft sticks, 99 chairs
Or wire mesh (6x6)21 sheets of 5 × 10 ft, about $252 – $420
Vapor barrier720 sq ft plus 6 in laps
Control joints 6 panels of about 10 × 12 ft: 78 lin ft of saw cut, 1.25 in deep

Recommended Specs for a Garage Floor

Thickness4 in minimum, 5 in typical; 6 in for heavy trucks or a lift
Strength3,500 PSI air-entrained (IRC minimum for garage floors in severe weathering areas)
Base4 to 6 in of compacted crushed stone, plus a 10-mil vapor barrier under heated or finished garages
Reinforcement#4 rebar at 18 in on chairs
EdgeMonolithic thickened edge (12 in wide, 12-18 in deep) or a stem wall on footings, per your permit
  • Use 3,500 PSI air-entrained concrete, or 4,000 PSI if salt-covered cars park inside.
  • Ask for a vapor barrier if you may heat or finish the garage later.
  • A thickened edge or stem wall is needed under the walls; the cost section shows the thickened-edge add-on.

Pour Day for a 24x30 Slab

  • Crew time: about 25 crew-hours to set forms, place, finish and cut joints (0.035 h per sq ft for a broom finish).
  • Trucks: 12.25 yd³ is 2 trucks, about 61–98 minutes of unloading in total. Concrete must be placed within 90 minutes of batching.
  • Reach: a truck chute reaches about 15–20 ft. At 24 ft wide, the middle is out of reach from one side, so plan access on two sides, a buggy, or a pump ($600 – $1,200).
  • Joints: saw-cut 4–12 hours after finishing with a wet saw, or 1–4 hours with an early-entry saw.
  • Curing: foot traffic after 24–48 hours, cars after 7 days, full strength at 28 days.

Price Your Own 24x30 Slab

The calculator below starts at 24 × 30 ft, 5 inches. Change the thickness, finish or reinforcement, pick your state for local prices, and the Live Estimate updates with a blueprint of the joint and rebar layout.

Concrete Slab Cost & Volume Estimator

Precision multi-layer project budgeting: Materials, Sub-Base, Reinforcement, Labor & Equipment

Picking a location sets the ready-mix, excavation and labor rates below to that area's typical level. You can still type your own local prices afterwards. Slab prices by state.

ft
ft
in
$
$ /sq ft
inches
$ /yd³
$ /lin ft
$ /sq ft

Closer spacing uses more steel and raises the rebar cost.

$
$ /sq ft
$

Not charged when bagged concrete is selected.

$
$
$
$ /sq ft
%
%
Live Estimate
Estimated Total Project Budget
$7,857.08
$10.91 / sq. ft.
$117.46 / m²
Based on U.S. national average rates
Order Volume (w/ Waste)
12.22 yd³
Net: 11.11 yd³
Or Bagged Equivalent
550 bags
80-lb pre-mix bags
Total Surface Area
720 sq ft (66.9 m²)
Order volume: 9.34 m³
Estimated Wet Weight
47,850 lbs
Perimeter: 108 ft
Concrete
Labor
Prep/Base
Rebar
Forms

A scaled plan of your slab: rebar grid at the spacing you chose, support chairs about every 3 to 4 ft, and the recommended control-joint saw cuts (2.5 times the thickness in inches, in feet, capped at 15 ft). It redraws as you change the inputs.

24x30 Slab Questions

About $5,250 to $9,350 installed for a 5-inch slab with forms, a broom finish and labor ($7.00 to $13.00 per sq ft), at U.S. average prices. DIY materials run about $2,190 to $3,340. Site prep and a gravel base add about $1,010 to $2,380.

At 4 inches thick with 10% waste: 440 bags of 80-lb mix, 587 bags of 60-lb mix or 880 bags of 40-lb mix. At 5 inches: 550 bags of 80-lb mix.

At 4 inches, 8.89 cubic yards (order 10.00 with waste); at 5 inches, 11.11 (order 12.25); at 6 inches, 13.33 (order 14.75). Ready-mix is sold in quarter yards, so round up.

Ready-mix. 12.25 yards delivered costs about $1,958, while 550 bags would cost about $3,650 and take roughly 22 hours of mixing. Bags only win below about 1.3 cubic yards.

A #4 grid at 18 inches each way needs about 1,036 linear feet of bar including laps: 52 twenty-foot sticks and about 99 chairs. Welded wire mesh instead takes 21 sheets of 5 x 10 ft.

The installed range on this page covers a 5-inch slab with forms, vapor barrier, #4 rebar and a broom finish. A monolithic thickened edge adds the amount shown in the cost section; excavation and gravel are extra.

Related Guides

Slab Estimating & Editorial Engineering Team

Construction Cost Estimators & Civil Engineering Analysts
Our team specializes in structural flatwork estimating, concrete mix designs, and civil building codes (ACI 302.1R, ASTM C94). All calculators and cost guides are rigorously validated against live contractor material price sheets, regional aggregate indexes, and real-world project bids.