Concrete Footing & Pier Calculator

Concrete Needed (w/ waste)
3.26 cu. yds
Or Bagged Equivalent
147 bags (80 lb)

Strip Footings and Round Piers

Strip footing
Length (ft) × Width (in) ÷ 12 × Depth (in) ÷ 12 ÷ 27
Round pier: 3.1416 × (diameter ÷ 2)² × depth, all in feet, then ÷ 27 for yards.

Footings must sit on undisturbed soil and, in cold climates, below the frost line (often 36 to 48 inches in northern states). Your building code and plans set the size; this tool only counts the concrete. Footings dug straight into the ground use more concrete than the drawing shows, so pick a higher waste allowance for trenches.

Need a Full Project Cost Estimate?

This tool works out one part of the job. Our Concrete Slab Cost Calculator prices the whole slab: concrete, gravel base, forms, vapor barrier, reinforcement, finish, labor and delivery.

Open the Slab Cost Calculator →

Frequently Asked Questions

Multiply the total run length (ft) by the footing width and depth (both converted from inches to feet), then divide by 27 to get cubic yards. This calculator adds your chosen waste allowance on top.
Pier volume uses the cylinder formula: π × radius² × depth, where the radius is half the sonotube diameter. Continuous strip footings instead use length × width × depth since they're a rectangular prism.
Footing depth is primarily driven by your local frost line depth and soil bearing capacity, both of which are set by your local building code — always confirm with your local building department or a licensed engineer before pouring a structural footing.

Slab Estimating & Editorial Engineering Team

Construction Cost Estimators & Civil Engineering Analysts
Our team specializes in structural flatwork estimating, concrete mix designs, and civil building codes (ACI 302.1R, ASTM C94). All calculators and cost guides are rigorously validated against live contractor material price sheets, regional aggregate indexes, and real-world project bids.