Turn slab measurements into the number of cubic yards to order from a ready-mix plant, with waste and rounding included.
A 20 × 20 ft slab 4 inches thick is 4.94 cubic yards. With 10% waste that is 5.43 yd³, so you would order 5.50 cubic yards, rounded up to the next quarter yard.
Cubic Yards to Order
From Volume to an Order
Running short is far more expensive than a little extra. A second delivery means another delivery fee and often a short-load fee ($80 to $200), and the first concrete may set before the rest arrives, leaving a weak cold joint. A truck carries about 8–10 yd³, so larger pours need more than one load, and many plants charge extra for orders under 5–6 yd³. The ready-mix calculator shows those fees and prices by strength.
Need a Full Project Cost Estimate?
This tool works out one part of the job. Our Concrete Slab Cost Calculator prices the whole slab: concrete, gravel base, forms, vapor barrier, reinforcement, finish, labor and delivery.