Concrete Slab Cost & Volume Estimator

Precision multi-layer project budgeting: Materials, Sub-Base, Reinforcement, Labor & Equipment

ft
ft
in
$
$ /sq ft
inches
$ /yd³
$ /lin ft
$ /sq ft
$
$ /sq ft
$
$
$
$
$ /sq ft
%
%
Estimated Total Project Budget
$0.00
$0.00 / sq. ft.
$0.00 / m²
Order Volume (w/ Waste)
0.00 yd³
Net: 0.00 yd³
Or Bagged Equivalent
0 bags
80-lb pre-mix bags
Total Surface Area
0 sq ft
0.00 m³ volume
Estimated Wet Weight
0 lbs
Perimeter: 0 ft
Concrete
Labor
Prep/Base
Rebar
Forms
Scope Item / Material Description Amount

Recommended Specifications for This Application

  • Standard Slab Thickness: 4 inches for pedestrian flatwork; 5 to 6 inches for passenger vehicles and light trucks; 6+ inches for RV parking pads.
  • Concrete Mix Strength: Minimum 3,000 PSI compressive strength for mild climates; 4,000 PSI with air-entrainment (5%–7%) for freeze-thaw climates.
  • Sub-Base Preparation: 4 to 6 inches of compacted #57 crushed stone base to allow water drainage and mitigate soil movement.
  • Reinforcement: #4 (1/2") steel rebar spaced at 12" to 18" grid centers on support chairs, or 6x6 welded wire mesh.

Installed vs. DIY Material Cost Matrix

Slab Dimensions Surface Area Cubic Yards (4" Thick) 80-lb Bags (w/ 10% Waste) Avg. Materials Only Avg. Installed Cost
10 × 10 ft 100 sq. ft. 1.23 yd³ 23 bags $220 – $350 $600 – $1,200
10 × 20 ft 200 sq. ft. 2.47 yd³ 45 bags $420 – $650 $1,200 – $2,400
12 × 12 ft 144 sq. ft. 1.78 yd³ 33 bags $310 – $480 $850 – $1,700
16 × 24 ft 384 sq. ft. 4.74 yd³ 87 bags $750 – $1,100 $2,300 – $4,600
20 × 20 ft 400 sq. ft. 4.94 yd³ 91 bags $800 – $1,200 $2,400 – $4,800
24 × 24 ft (2-Car Garage) 576 sq. ft. 7.11 yd³ 130 bags $1,100 – $1,750 $3,500 – $6,900
30 × 40 ft (Shop/Barn) 1,200 sq. ft. 14.81 yd³ 272 bags $2,300 – $3,600 $7,200 – $14,400
*Note: Cost ranges reflect typical residential North American pricing ($135–$175/yd³ ready-mix delivered; $6.00–$12.00/sq. ft. installed with sub-base and labor). Actual costs vary by locality and access.

Important Construction Considerations

Ensure adequate slope (minimum 1/4 inch per foot) away from adjoining building walls for proper drainage. Cut control joints to a depth of 1/4 the slab thickness within 12 to 24 hours of pouring to prevent uncontrolled cracking.

Slab Estimating & Editorial Engineering Team