Installed cost
$590 – $990
$9.00 – $15.50 / sq ft
Concrete (+10%)
0.87 yd³
Net 0.79 yd³ at 4 in
80-lb bags
40
53 × 60-lb
Best way to buy
Bags
$335 with mixer

An 8 × 8 ft pad is the usual footprint for a two- to four-person hot tub, a standby generator or a pair of heat-pump condensers. At 64 sq ft it is a small pour, 40 bags of 80-lb mix, but it carries a heavy, concentrated load: a filled 7 × 7 ft tub with people in it puts roughly 100 lb on every square foot. The base and a level top matter more here than on a patio of the same size.

Concrete for an 8x8 Slab at 4, 5 and 6 Inches

ThicknessNet volumeWith 10% wasteReady-mix order80-lb bags60-lb bags40-lb bagsInstalled
4 in (typical) 0.79 yd³ 0.87 yd³ 1 yd³ 40 53 79 $590–$990
5 in 0.99 yd³ 1.09 yd³ 1.25 yd³ 49 66 98 $630–$1,030
6 in 1.19 yd³ 1.30 yd³ 1.5 yd³ 59 79 118 $660–$1,070
Bag yields: 80 lb = 0.60 ft³, 60 lb = 0.45 ft³, 40 lb = 0.30 ft³, rounded up to whole bags. Ready-mix rounded up to the next quarter yard. Installed low end: plain broom-finish slab with ready-mix at $150/yd³ plus a $120 delivery fee, forms and labor at $3.50/sq ft. High end: the calculator's default scope (adds a vapor barrier and #4 rebar at 18 in, labor at $5.00/sq ft) plus 25% contractor overhead and profit. DIY materials: the cheaper of ready-mix or $6.50 80-lb bags, plus forms, up to vapor barrier and rebar. Site excavation and a gravel base are extra (about $1.40 to $3.30 per sq ft).

How Much Extra to Order

The table above adds 10%, the usual allowance for a formed slab on a graded base. Pick less only for rigid forms on a laser-flat base, more for soft or uneven ground:

Waste allowance (4 in slab)Concrete80-lb bags
0% (exact volume)0.79 yd³36
5%0.83 yd³38
10%0.87 yd³40
15%0.91 yd³41

Bags or a Ready-Mix Truck?

OptionWhat you buyConcrete bill
80-lb bags 40 bags at $6.50 + mixer rental $75 $335
Ready-mix 1 yd³ at $150 + $120 delivery + $140 short-load fee $410

At 0.87 yd³, bags come out $75 cheaper, mostly because a small ready-mix order pays the delivery fee and a short-load fee. The trade-off is labor: 40 bags is about 1.6 hours of mixing for a small crew with one drum mixer, and every bag weighs 80 lb. Try your own prices in the bags vs. ready-mix calculator.

What an 8x8 Slab Costs

Line item (4 in slab)BasisCost
Ready-mix concrete + delivery0.87 yd³ at $150 + $120$250
Forms32 lin ft at $2.20$70
Vapor barrier64 sq ft at $0.35$22
#4 rebar at 18 in64 sq ft at $1.25$80
Broom finish64 sq ft at $0.75$48
Labor (place & finish)64 sq ft at $5.00$320
Direct costBefore overhead and profit$791
  • Installed price: $590 – $990. The low end is a plain slab with lower-cost labor; the high end is the full scope above plus 25% contractor overhead and profit.
  • Site prep and gravel base (excavation and 4 in of compacted stone): about $90 – $210 more.
  • Permit, where one is needed: about $50 – $350.

Have a contractor's price? Put it into the concrete quote checker, or compare two or three bids side by side there.

Materials List for an 8 × 8 ft Slab

Concrete1 yd³ ready-mix, or 40 × 80-lb / 79 × 40-lb bags
Gravel base (4 in compacted)0.91 yd³, about 1.3 tons
Forms4 × 2x4 boards 12 ft long, 12 stakes, 24 screws (32 lin ft)
Rebar (#4 at 18 in)99 lin ft = 5 × 20-ft sticks, 9 chairs
Or wire mesh (6x6)2 sheets of 5 × 10 ft, about $24 – $40
Vapor barrier64 sq ft plus 6 in laps
Control joints None needed: both sides are within the 10 ft joint spacing for 4 in

Recommended Specs for a Hot Tub Or Equipment Pad

Thickness4 in; 6 in where the tub maker asks for it (common for large or swim spas)
Strength3,000 PSI; 3,500 PSI air-entrained where it freezes
Base4 to 6 in of compacted crushed stone, compacted in lifts
Reinforcement6x6 welded wire mesh or #3 rebar at 18 in, on chairs
SurfaceDead level (no drainage slope), broom or light trowel finish
  • Read the tub or generator install guide before you pour. Most ask for at least 4 in of concrete on a compacted base; some large tubs ask for 6 in.
  • Keep the top level. A patio gets a drainage slope; a hot tub pad should not, or the tub will sit out of level.
  • If the electrical feed comes up through the pad, set the conduit and sweep before the pour. Cutting into a finished pad later costs more than the pad.

Pour Day for an 8x8 Slab

  • Crew time: about 2 crew-hours to set forms, place, finish and cut joints (0.035 h per sq ft for a broom finish).
  • Reach: a truck chute reaches about 15–20 ft, enough for this slab if the truck can park beside it. If it can't, budget wheelbarrows or a line pump.
  • Joints: saw-cut 4–12 hours after finishing with a wet saw, or 1–4 hours with an early-entry saw.
  • Curing: foot traffic after 24–48 hours, cars after 7 days, full strength at 28 days.

Price Your Own 8x8 Slab

The calculator below starts at 8 × 8 ft, 4 inches. Change the thickness, finish or reinforcement, pick your state for local prices, and the Live Estimate updates with a blueprint of the joint and rebar layout.

Concrete Slab Cost & Volume Estimator

Precision multi-layer project budgeting: Materials, Sub-Base, Reinforcement, Labor & Equipment

Picking a location sets the ready-mix, excavation and labor rates below to that area's typical level. You can still type your own local prices afterwards. Slab prices by state.

ft
ft
in
$
$ /sq ft
inches
$ /yd³
$ /lin ft
$ /sq ft

Closer spacing uses more steel and raises the rebar cost.

$
$ /sq ft
$

Not charged when bagged concrete is selected.

$
$
$
$ /sq ft
%
%
Live Estimate
Estimated Total Project Budget
$830.73
$12.98 / sq. ft.
$139.72 / m²
Based on U.S. national average rates
Order Volume (w/ Waste)
0.87 yd³
Net: 0.79 yd³
Or Bagged Equivalent
40 bags
80-lb pre-mix bags
Total Surface Area
64 sq ft (5.9 m²)
Order volume: 0.66 m³
Estimated Wet Weight
3,403 lbs
Perimeter: 32 ft
Concrete
Labor
Prep/Base
Rebar
Forms

A scaled plan of your slab: rebar grid at the spacing you chose, support chairs about every 3 to 4 ft, and the recommended control-joint saw cuts (2.5 times the thickness in inches, in feet, capped at 15 ft). It redraws as you change the inputs.

8x8 Slab Questions

About $590 to $990 installed for a 4-inch slab with forms, a broom finish and labor ($9.00 to $15.50 per sq ft), at U.S. average prices. DIY materials run about $320 to $420. Site prep and a gravel base add about $90 to $210.

At 4 inches thick with 10% waste: 40 bags of 80-lb mix, 53 bags of 60-lb mix or 79 bags of 40-lb mix. At 6 inches: 59 bags of 80-lb mix.

At 4 inches, 0.79 cubic yards (order 1.00 with waste); at 5 inches, 0.99 (order 1.25); at 6 inches, 1.19 (order 1.50). Ready-mix is sold in quarter yards, so round up.

Bags are a little cheaper here: 40 bags cost about $335 with a rented mixer, against about $410 for a 1-yard ready-mix load with delivery and short-load fees. Mixing takes about 1.6 hours for a small crew.

A #4 grid at 18 inches each way needs about 99 linear feet of bar including laps: 5 twenty-foot sticks and about 9 chairs. Welded wire mesh instead takes 2 sheets of 5 x 10 ft.

For most two- to four-person tubs, yes, on a compacted gravel base with wire mesh or light rebar. Larger tubs and swim spas often call for 6 inches; follow the maker's install guide, because the warranty can depend on it.

Related Guides

Slab Estimating & Editorial Engineering Team

Construction Cost Estimators & Civil Engineering Analysts
Our team specializes in structural flatwork estimating, concrete mix designs, and civil building codes (ACI 302.1R, ASTM C94). All calculators and cost guides are rigorously validated against live contractor material price sheets, regional aggregate indexes, and real-world project bids.