Installed cost
$1,510 – $2,660
$7.50 – $13.50 / sq ft
Concrete (+10%)
2.72 yd³
Net 2.47 yd³ at 4 in
80-lb bags
123
163 × 60-lb
Best way to buy
Ready-mix
1 truck, $673

A 10 × 20 ft slab (200 sq ft) is a parking pad for one car, a boat or utility trailer, or a long side-yard storage area. It is just over the size where ready-mix starts to win on price, and because it may carry a vehicle, it gets rebar rather than mesh.

Concrete for a 10x20 Slab at 4, 5 and 6 Inches

ThicknessNet volumeWith 10% wasteReady-mix order80-lb bags60-lb bags40-lb bagsInstalled
4 in (typical) 2.47 yd³ 2.72 yd³ 2.75 yd³ 123 163 245 $1,510–$2,660
5 in 3.09 yd³ 3.40 yd³ 3.5 yd³ 153 204 306 $1,610–$2,790
6 in 3.70 yd³ 4.07 yd³ 4.25 yd³ 184 245 367 $1,710–$2,920
Bag yields: 80 lb = 0.60 ft³, 60 lb = 0.45 ft³, 40 lb = 0.30 ft³, rounded up to whole bags. Ready-mix rounded up to the next quarter yard. Installed low end: plain broom-finish slab with ready-mix at $150/yd³ plus a $120 delivery fee, forms and labor at $3.50/sq ft. High end: the calculator's default scope (adds a vapor barrier and #4 rebar at 18 in, labor at $5.00/sq ft) plus 25% contractor overhead and profit. DIY materials: the cheaper of ready-mix or $6.50 80-lb bags, plus forms, up to vapor barrier and rebar. Site excavation and a gravel base are extra (about $1.40 to $3.30 per sq ft).

How Much Extra to Order

The table above adds 10%, the usual allowance for a formed slab on a graded base. Pick less only for rigid forms on a laser-flat base, more for soft or uneven ground:

Waste allowance (4 in slab)Concrete80-lb bags
0% (exact volume)2.47 yd³112
5%2.59 yd³117
10%2.72 yd³123
15%2.84 yd³128

Bags or a Ready-Mix Truck?

OptionWhat you buyConcrete bill
80-lb bags 123 bags at $6.50 + mixer rental $75 $875
Ready-mix 2.75 yd³ at $150 + $120 delivery + $140 short-load fee $673

Ready-mix is $202 cheaper here and saves about 4.9 hours of mixing 123 bags. Bags only win below about 1.3 yd³, once the delivery and short-load fees are counted. Try your own prices in the bags vs. ready-mix calculator.

What a 10x20 Slab Costs

Line item (4 in slab)BasisCost
Ready-mix concrete + delivery2.72 yd³ at $150 + $120$527
Forms60 lin ft at $2.20$132
Vapor barrier200 sq ft at $0.35$70
#4 rebar at 18 in200 sq ft at $1.25$250
Broom finish200 sq ft at $0.75$150
Labor (place & finish)200 sq ft at $5.00$1,000
Direct costBefore overhead and profit$2,129
  • Installed price: $1,510 – $2,660. The low end is a plain slab with lower-cost labor; the high end is the full scope above plus 25% contractor overhead and profit.
  • Site prep and gravel base (excavation and 4 in of compacted stone): about $280 – $660 more.
  • Permit, where one is needed: about $50 – $350.

Have a contractor's price? Put it into the concrete quote checker, or compare two or three bids side by side there.

Materials List for a 10 × 20 ft Slab

Concrete2.75 yd³ ready-mix, or 123 × 80-lb / 245 × 40-lb bags
Gravel base (4 in compacted)2.84 yd³, about 4.0 tons
Forms6 × 2x4 boards 12 ft long, 24 stakes, 48 screws (60 lin ft)
Rebar (#4 at 18 in)296 lin ft = 15 × 20-ft sticks, 28 chairs
Or wire mesh (6x6)9 sheets of 5 × 10 ft, about $108 – $180
Vapor barrier200 sq ft plus 6 in laps
Control joints 2 panels of about 10 × 10 ft: 10 lin ft of saw cut, 1 in deep

Recommended Specs for a Carport Or Parking Pad

Thickness4 in for cars; 5 in for pickups, trailers and RVs
Strength3,500 PSI air-entrained; 4,000 PSI where de-icing salt is tracked in
Base4 to 6 in of compacted crushed stone
Reinforcement#4 rebar at 18 in on chairs
PostsCarport posts on their own footings (or thickened slab under each post), sized by the carport kit or engineer
  • For a trailer or pickup pad, pour 5 in thick: the 5-in row in the table below adds about a quarter more concrete.
  • Slope the pad along its length so water runs off one short end, away from any building.
  • Leave a gap with expansion joint material where the pad meets an existing driveway or garage slab.

Pour Day for a 10x20 Slab

  • Crew time: about 7 crew-hours to set forms, place, finish and cut joints (0.035 h per sq ft for a broom finish).
  • Trucks: 2.75 yd³ is 1 truck, about 14–22 minutes of unloading in total. Concrete must be placed within 90 minutes of batching.
  • Reach: a truck chute reaches about 15–20 ft, enough for this slab if the truck can park beside it. If it can't, budget wheelbarrows or a line pump.
  • Joints: saw-cut 4–12 hours after finishing with a wet saw, or 1–4 hours with an early-entry saw.
  • Curing: foot traffic after 24–48 hours, cars after 7 days, full strength at 28 days.

Price Your Own 10x20 Slab

The calculator below starts at 10 × 20 ft, 4 inches. Change the thickness, finish or reinforcement, pick your state for local prices, and the Live Estimate updates with a blueprint of the joint and rebar layout.

Concrete Slab Cost & Volume Estimator

Precision multi-layer project budgeting: Materials, Sub-Base, Reinforcement, Labor & Equipment

Picking a location sets the ready-mix, excavation and labor rates below to that area's typical level. You can still type your own local prices afterwards. Slab prices by state.

ft
ft
in
$
$ /sq ft
inches
$ /yd³
$ /lin ft
$ /sq ft

Closer spacing uses more steel and raises the rebar cost.

$
$ /sq ft
$

Not charged when bagged concrete is selected.

$
$
$
$ /sq ft
%
%
Live Estimate
Estimated Total Project Budget
$2,235.88
$11.18 / sq. ft.
$120.33 / m²
Based on U.S. national average rates
Order Volume (w/ Waste)
2.72 yd³
Net: 2.47 yd³
Or Bagged Equivalent
123 bags
80-lb pre-mix bags
Total Surface Area
200 sq ft (18.6 m²)
Order volume: 2.08 m³
Estimated Wet Weight
10,633 lbs
Perimeter: 60 ft
Concrete
Labor
Prep/Base
Rebar
Forms

A scaled plan of your slab: rebar grid at the spacing you chose, support chairs about every 3 to 4 ft, and the recommended control-joint saw cuts (2.5 times the thickness in inches, in feet, capped at 15 ft). It redraws as you change the inputs.

10x20 Slab Questions

About $1,510 to $2,660 installed for a 4-inch slab with forms, a broom finish and labor ($7.50 to $13.50 per sq ft), at U.S. average prices. DIY materials run about $660 to $980. Site prep and a gravel base add about $280 to $660.

At 4 inches thick with 10% waste: 123 bags of 80-lb mix, 163 bags of 60-lb mix or 245 bags of 40-lb mix. At 6 inches: 184 bags of 80-lb mix.

At 4 inches, 2.47 cubic yards (order 2.75 with waste); at 5 inches, 3.09 (order 3.50); at 6 inches, 3.70 (order 4.25). Ready-mix is sold in quarter yards, so round up.

Ready-mix. 2.75 yards delivered costs about $673, while 123 bags would cost about $875 and take roughly 5 hours of mixing. Bags only win below about 1.3 cubic yards.

A #4 grid at 18 inches each way needs about 296 linear feet of bar including laps: 15 twenty-foot sticks and about 28 chairs. Welded wire mesh instead takes 9 sheets of 5 x 10 ft.

Yes for one compact or mid-size car: 10 ft gives enough width to open doors on one side. Make it 12 ft wide if you need to open doors on both sides or park a full-size pickup.

Related Guides

Slab Estimating & Editorial Engineering Team

Construction Cost Estimators & Civil Engineering Analysts
Our team specializes in structural flatwork estimating, concrete mix designs, and civil building codes (ACI 302.1R, ASTM C94). All calculators and cost guides are rigorously validated against live contractor material price sheets, regional aggregate indexes, and real-world project bids.