Installed cost
$2,290 – $4,100
$7.00 – $13.00 / sq ft
Concrete (+10%)
4.35 yd³
Net 3.95 yd³ at 4 in
80-lb bags
196
261 × 60-lb
Best way to buy
Ready-mix
1 truck, $935

A 16 × 20 ft slab (320 sq ft) is a large family patio with room for dining, a grill and a seating group, or the floor of a backyard studio. It is a full ready-mix pour of 4.35 yd³, and at this size a second finisher and a bull float make the difference between a smooth surface and a rushed one.

Concrete for a 16x20 Slab at 4, 5 and 6 Inches

ThicknessNet volumeWith 10% wasteReady-mix order80-lb bags60-lb bags40-lb bagsInstalled
4 in (typical) 3.95 yd³ 4.35 yd³ 4.5 yd³ 196 261 392 $2,290–$4,100
5 in 4.94 yd³ 5.43 yd³ 5.5 yd³ 245 326 489 $2,450–$4,310
6 in 5.93 yd³ 6.52 yd³ 6.75 yd³ 294 392 587 $2,620–$4,510
Bag yields: 80 lb = 0.60 ft³, 60 lb = 0.45 ft³, 40 lb = 0.30 ft³, rounded up to whole bags. Ready-mix rounded up to the next quarter yard. Installed low end: plain broom-finish slab with ready-mix at $150/yd³ plus a $120 delivery fee, forms and labor at $3.50/sq ft. High end: the calculator's default scope (adds a vapor barrier and #4 rebar at 18 in, labor at $5.00/sq ft) plus 25% contractor overhead and profit. DIY materials: the cheaper of ready-mix or $6.50 80-lb bags, plus forms, up to vapor barrier and rebar. Site excavation and a gravel base are extra (about $1.40 to $3.30 per sq ft).

How Much Extra to Order

The table above adds 10%, the usual allowance for a formed slab on a graded base. Pick less only for rigid forms on a laser-flat base, more for soft or uneven ground:

Waste allowance (4 in slab)Concrete80-lb bags
0% (exact volume)3.95 yd³178
5%4.15 yd³187
10%4.35 yd³196
15%4.54 yd³205

Bags or a Ready-Mix Truck?

OptionWhat you buyConcrete bill
80-lb bags 196 bags at $6.50 + mixer rental $75 $1,349
Ready-mix 4.5 yd³ at $150 + $120 delivery + $140 short-load fee $935

Ready-mix, without question. 196 bags would cost $1,349 and take about 8 hours of mixing, far longer than concrete stays workable, so the slab would end up with cold joints. Ready-mix trucks bring it as fast as the crew can place it. Try your own prices in the bags vs. ready-mix calculator.

What a 16x20 Slab Costs

Line item (4 in slab)BasisCost
Ready-mix concrete + delivery4.35 yd³ at $150 + $120$772
Forms72 lin ft at $2.20$158
Vapor barrier320 sq ft at $0.35$112
#4 rebar at 18 in320 sq ft at $1.25$400
Broom finish320 sq ft at $0.75$240
Labor (place & finish)320 sq ft at $5.00$1,600
Direct costBefore overhead and profit$3,282
  • Installed price: $2,290 – $4,100. The low end is a plain slab with lower-cost labor; the high end is the full scope above plus 25% contractor overhead and profit.
  • Site prep and gravel base (excavation and 4 in of compacted stone): about $450 – $1,060 more.
  • Stamped finish instead of broom: about $4,450 – $6,800 installed.
  • Permit, where one is needed: about $50 – $350.

Have a contractor's price? Put it into the concrete quote checker, or compare two or three bids side by side there.

Materials List for a 16 × 20 ft Slab

Concrete4.5 yd³ ready-mix, or 196 × 80-lb / 392 × 40-lb bags
Gravel base (4 in compacted)4.54 yd³, about 6.4 tons
Forms8 × 2x4 boards 12 ft long, 30 stakes, 60 screws (72 lin ft)
Rebar (#4 at 18 in)475 lin ft = 24 × 20-ft sticks, 42 chairs
Or wire mesh (6x6)10 sheets of 5 × 10 ft, about $120 – $200
Vapor barrier320 sq ft plus 6 in laps
Control joints 4 panels of about 10 × 8 ft: 36 lin ft of saw cut, 1 in deep

Recommended Specs for a Patio

Thickness4 in
Strength3,000 PSI; 3,500 PSI air-entrained where it freezes
Base4 to 6 in of compacted crushed stone
Reinforcement6x6 wire mesh or fiber mix; #3-#4 rebar on expansive clay
Drainage1/8 to 1/4 in per foot away from the house
  • Plan where the truck parks: the chute reaches about 15-20 ft, so a patio behind the house may need a wheelbarrow crew or a pump.
  • Slope the patio away from the house at about 1/4 in per foot; over 16 ft that is a 4-in drop, which the forms must show.
  • Seal the patio after it cures (about a month) to hold up to freeze-thaw and stains.

Pour Day for a 16x20 Slab

  • Crew time: about 11 crew-hours to set forms, place, finish and cut joints (0.035 h per sq ft for a broom finish).
  • Trucks: 4.5 yd³ is 1 truck, about 23–36 minutes of unloading in total. Concrete must be placed within 90 minutes of batching.
  • Reach: a truck chute reaches about 15–20 ft, enough for this slab if the truck can park beside it. If it can't, budget wheelbarrows or a line pump.
  • Joints: saw-cut 4–12 hours after finishing with a wet saw, or 1–4 hours with an early-entry saw.
  • Curing: foot traffic after 24–48 hours, cars after 7 days, full strength at 28 days.

Price Your Own 16x20 Slab

The calculator below starts at 16 × 20 ft, 4 inches. Change the thickness, finish or reinforcement, pick your state for local prices, and the Live Estimate updates with a blueprint of the joint and rebar layout.

Concrete Slab Cost & Volume Estimator

Precision multi-layer project budgeting: Materials, Sub-Base, Reinforcement, Labor & Equipment

Picking a location sets the ready-mix, excavation and labor rates below to that area's typical level. You can still type your own local prices afterwards. Slab prices by state.

ft
ft
in
$
$ /sq ft
inches
$ /yd³
$ /lin ft
$ /sq ft

Closer spacing uses more steel and raises the rebar cost.

$
$ /sq ft
$

Not charged when bagged concrete is selected.

$
$
$
$ /sq ft
%
%
Live Estimate
Estimated Total Project Budget
$3,446.36
$10.77 / sq. ft.
$115.93 / m²
Based on U.S. national average rates
Order Volume (w/ Waste)
4.35 yd³
Net: 3.95 yd³
Or Bagged Equivalent
196 bags
80-lb pre-mix bags
Total Surface Area
320 sq ft (29.7 m²)
Order volume: 3.32 m³
Estimated Wet Weight
17,013 lbs
Perimeter: 72 ft
Concrete
Labor
Prep/Base
Rebar
Forms

A scaled plan of your slab: rebar grid at the spacing you chose, support chairs about every 3 to 4 ft, and the recommended control-joint saw cuts (2.5 times the thickness in inches, in feet, capped at 15 ft). It redraws as you change the inputs.

16x20 Slab Questions

About $2,290 to $4,100 installed for a 4-inch slab with forms, a broom finish and labor ($7.00 to $13.00 per sq ft), at U.S. average prices. DIY materials run about $930 to $1,440. Site prep and a gravel base add about $450 to $1,060.

At 4 inches thick with 10% waste: 196 bags of 80-lb mix, 261 bags of 60-lb mix or 392 bags of 40-lb mix. At 6 inches: 294 bags of 80-lb mix.

At 4 inches, 3.95 cubic yards (order 4.50 with waste); at 5 inches, 4.94 (order 5.50); at 6 inches, 5.93 (order 6.75). Ready-mix is sold in quarter yards, so round up.

Ready-mix. 4.5 yards delivered costs about $935, while 196 bags would cost about $1,349 and take roughly 8 hours of mixing. Bags only win below about 1.3 cubic yards.

A #4 grid at 18 inches each way needs about 475 linear feet of bar including laps: 24 twenty-foot sticks and about 42 chairs. Welded wire mesh instead takes 10 sheets of 5 x 10 ft.

At 4 inches thick, 3.95 cubic yards net and 4.35 with waste, so order 4.5 yards. That is below many plants' minimum load, so ask about a short-load fee.

Related Guides

Slab Estimating & Editorial Engineering Team

Construction Cost Estimators & Civil Engineering Analysts
Our team specializes in structural flatwork estimating, concrete mix designs, and civil building codes (ACI 302.1R, ASTM C94). All calculators and cost guides are rigorously validated against live contractor material price sheets, regional aggregate indexes, and real-world project bids.