Quick answer: bagged concrete costs about $293 per cubic yard in 80-lb bags, while ready-mix runs about $135 to $160 per yard plus a delivery fee. Bags usually win below about 1 cubic yard, ready-mix usually wins above about 1.5 yards, and in between it depends on your supplier's delivery and short-load fees. Ready-mix is also more consistent, because the plant controls the water.

The choice between a truck and a pallet of bags comes down to three things: money, labor and quality. Bags have no delivery fee, so they are cheap for tiny jobs. But each bag must be lifted, mixed and placed by hand, and that work grows fast. Ready-mix has a fixed delivery cost, so it gets cheaper per yard the more you order. This guide puts real numbers on each side.

The Cost Per Yard Gap

An 80-lb bag yields 0.60 cubic feet, so a cubic yard (27 ft³) takes 45 bags. At about $6.50 per bag, that is $293 per yard, roughly twice the $150 our calculator uses for 3,000 PSI ready-mix. Smaller bags cost even more per yard (see our cost per cubic yard guide). The truck wins on unit price every time. What it loses on is the fixed fee.

Break-Even Table

Here is what each route costs at common job sizes. Ready-mix is rounded up to the next 0.5 yard, with the $120 delivery fee our calculator uses. The last column adds a short-load fee at the top of the usual $80 to $200 range, which many plants charge on orders under their minimum.

Concrete neededCovers at 4 in80-lb bagsBag costReady-mix (delivery fee)Ready-mix + high short-load feeCheaper
0.25 yd³20 sq ft12$78$195$395Bags
0.50 yd³41 sq ft23$150$195$395Bags
0.75 yd³61 sq ft34$221$270$470Bags
1.00 yd³81 sq ft45$293$270$470Depends on fees
1.50 yd³122 sq ft68$442$345$545Depends on fees
2.00 yd³162 sq ft90$585$420$620Depends on fees
3.00 yd³243 sq ft135$878$570$770Ready-mix
4.00 yd³324 sq ft180$1,170$720$920Ready-mix
80-lb bags at $6.50; ready-mix at $150/yd³. Mixer rental, fuel surcharges and pump fees not included. Add 10% waste to your measured volume before using this table.

On price alone, the break-even sits at about 0.84 yards when the only extra is a $120 delivery fee, and moves out to about 2.25 yards when a plant adds a $200 short-load fee on top. That is where the rule of thumb comes from. Call two local plants and ask for the full delivered price on your volume before you buy a single bag.

Labor and Time: The Hidden Cost of Bags

Price is only half the story. A 3-person crew with one rented drum mixer can mix and place roughly 20 to 30 80-lb bags an hour. That sounds fast until you do the math on a slab:

Concrete80-lb bagsWeight to liftMixing time (3 people, 1 mixer)
0.50 yd³230.9 tons0.8 to 1.2 hours
1.00 yd³451.8 tons1.5 to 2.3 hours
1.50 yd³682.7 tons2.3 to 3.4 hours
2.00 yd³903.6 tons3.0 to 4.5 hours
3.00 yd³1355.4 tons4.5 to 6.8 hours

Every bag gets lifted at least twice (into the cart, then into the mixer), so the real work is more than the tonnage suggests. Add a mixer rental of about $50 to $100 a day. A ready-mix truck, by contrast, unloads in about 5 to 8 minutes per yard. Your crew's job is spreading, screeding and finishing, not mixing.

Cold joints on long bag pours

If the first batches start to stiffen before the last ones are placed, the slab ends up with weak seams between batches. On a pour that will take more than a couple of hours, either add another mixer and more helpers, or split the slab into sections with planned joints.

Strength and Consistency: ASTM C94 vs. ASTM C387

Ready-mixBagged mix
StandardASTM C94, Standard Specification for Ready-Mixed ConcreteASTM C387, Packaged Dry, Combined Materials for Concrete
StrengthYou order the grade, from 2,500 to 5,000 PSI and upC387 normal-strength mix must reach at least 3,500 PSI at 28 days; many general-purpose bags are rated 4,000 PSI
Water controlBatched by weight at the plant; slump agreed in advanceDepends on you. About 3 quarts per 80-lb bag is typical; more water means a weaker slab
Air entrainmentAvailable on request (5% to 7% air) for freeze-thaw exposureMost general-purpose bags are not air-entrained; check the label
Batch to batchOne uniform loadVaries with each batch's water and mixing time
Time limitDischarge within 90 minutes of batching (C94 default)Each batch has its own clock; you set the pace

Both can make a strong slab. A bag rated at 4,000 PSI is stronger on paper than the 3,000 PSI minimum the IRC (Table R402.2) sets for exposed concrete in mild climates. The difference is control. A plant weighs every ingredient; a homeowner with a hose rarely adds the same water twice. In freeze-thaw areas, where the IRC calls for 3,500 PSI air-entrained concrete on garage floors, porches and steps, ready-mix is the safer route for anything large.

Worked Example: 12x12 Patio, 4 Inches Thick

12 ft × 12 ft × 4 in, with 10% waste
1.96 yd³ = 88 bags (80 lb) or 2 yd³ ready-mix
Bags: $572 plus a mixer rental = $622 to $672, 3.5 tons to lift and 2.9 to 4.4 hours of mixing. Ready-mix: $420 to $620 delivered depending on the short-load fee, unloaded in about 10 to 16 minutes.

For this patio, once you count the mixer rental, ready-mix costs less even with a high short-load fee, and it saves an afternoon of heavy labor. The catch is access: the truck needs to get within about 15 to 20 ft of the forms, or you need wheelbarrows and helpers, or a line pump at $400 to $800.

When Each One Wins

Choose bags when:

  • The job is under about 1 yard: fence posts, a small landing, an AC pad, a few footings.
  • The site is far from the street, behind a house, or up steps where a truck and pump would cost more than the concrete.
  • You want to work in sections over a weekend at your own pace.
  • You need a special product sold in bags, such as fast-setting mix for posts or high-strength mix for a small repair.

Choose ready-mix when:

  • The job is over about 1.5 yards: patios, driveways, garage floors and anything bigger.
  • The slab must be poured in one piece with no cold joints.
  • You need a specific strength, air entrainment or fiber for freeze-thaw, road salt or vehicle loads.
  • You do not have three strong helpers and a mixer for half a day.

Run Your Numbers

Measure your slab and get the volume from the concrete volume calculator, then compare routes with the concrete bags calculator and the ready-mix concrete calculator. For a full project budget including forms, base and labor, use the slab cost calculator. If you are going the bag route, our guide to how many bags of concrete you need covers every bag size.

Sources and Method

Bag yields are the published yields for 80, 60, 50 and 40-lb bags of general-purpose concrete mix. Prices and mixing rates are this site's 2026 working figures (see our methodology) and vary by region and store. Ready-mix requirements come from ASTM C94; packaged mix requirements come from ASTM C387. Strength minimums follow the International Residential Code, Table R402.2. Your local plant's minimum load and fees decide where your own break-even falls.

Frequently Asked Questions

For small jobs, bags. For anything over about 1.5 cubic yards, ready-mix. Bagged concrete costs about $293 per yard in 80-lb bags against roughly $150 for ready-mix, but ready-mix adds a delivery fee and often a short-load fee of $80 to $200 on small orders.

On price alone, at about 0.84 cubic yards when the only extra is a $120 delivery fee, and at about 2.25 yards if the plant adds a $200 short-load fee. Below about 1 yard, bags usually win.

It can be. ASTM C387 requires normal-strength bag mix to reach at least 3,500 PSI at 28 days, and many general-purpose bags are rated 4,000 PSI. The weak point is water: adding more than the bag calls for (about 3 quarts per 80-lb bag) lowers strength. Ready-mix is batched by weight at the plant, so it is more consistent.

A yard is 45 bags of 80-lb mix. A 3-person crew with one drum mixer handles about 20 to 30 bags an hour, so plan on 1.5 to 2.3 hours per yard.

45 bags of 80-lb mix, 60 bags of 60-lb mix, 72 bags of 50-lb mix, or 90 bags of 40-lb mix.

Calculate Your Concrete Project Budget

Use our comprehensive concrete slab cost calculator to get a complete line-item breakdown of materials, labor, reinforcement, and base preparation.

Launch Concrete Slab Calculator →

Slab Estimating & Editorial Engineering Team

Construction Cost Estimators & Civil Engineering Analysts
Our team specializes in structural flatwork estimating, concrete mix designs, and civil building codes (ACI 302.1R, ASTM C94). All calculators and cost guides are rigorously validated against live contractor material price sheets, regional aggregate indexes, and real-world project bids.